President Mills Inspects Achimota – Suhum Stretch Of Road President John Evans Atta Mills is inspecting progress of work on the Achimota-Suhum stretch of road. The public has been complaining about the slow pace of work. The Resident Engineer on the Achimota-Ofankor Road, Shelter Lotsu, told President Mills that they are working hard to ensure that they finish the construction on time. President Mills asked the public to bear with the contractors as they work to satisfy them On the progress of work on the Taifa Bridge, Mr Lotsu said there is about 3% work left and promised that it will be completed within the next two months. The Minister of Roads and Highways, Joe Gidisu, who was part of the inspection team, gave a background to the construction of the road. GBC